Athletes' Village | Urban Project - St-Ouen-Sur-Seine (93)

Urban planner coordinating the Riverain sector

Urban and landscape coordination for the Athletes' Village riverside area, integrating the requirements of the Olympic Games and post-event reversibility.

Urban planner coordinator,Athletes' Village,Saint-Ouen-Sur-Seine,Paris 2024,Urban planning
Urban planner coordinator,Athletes' Village,Saint-Ouen-Sur-Seine,Paris 2024,Urban planning
Urban planner coordinator,Athletes' Village,Saint-Ouen-Sur-Seine,Paris 2024,Urban planning

At the junction between the future Hub Pleyel and the fabric of Vieux Saint Ouen, lot E embodies the inhabited part of the Olympic village, the most domestic.
The project being developed is part of a process to further develop the master plan designed by the architect Dominique Perrault, in order to embody the urban, architectural and landscaping guidelines bequeathed to him. The aim is to create a truly Audonian neighbourhood, at the cutting edge of living comfort, accessibility and ecology.

Urban planner coordinator,Athletes' Village,Saint-Ouen-Sur-Seine,Paris 2024,Urban planning

CoBe urbanisme's role is to coordinate the seven architectural lots, in conjunction with the landscape project.

  • Get to grips with the project by Dominique Perrault and the TER agency: define the «ships», the two macro-lots (the Belvedere and the Villas). Defining their architectural identity, working on a «family resemblance» common to all the buildings, in particular through the materiality and architectural style.
  • Defining and spatialising the programming: programming that is in tune with the area and the uses of current and future residents, in order to establish the future district's territorial roots.
  • Supporting architects in complying with the various specifications, reconciling the challenges of the Olympic Games and legacy phases, the challenges of universal accessibility, etc.

Reference sheet

Contracting authority
SCCV Saint-Ouen Héritage
Nexity (representative)
Eiffage Immobilier
CDC Habitat

Project managment
CoBe, architectural coordinator (Le Belvédère) and urban architect lot E2-B
KOZ ARCHITECTES, architectural (Les Villas) and technical coordinator and architect for lots E2-A and E4
ATELIER GEORGES, landscape coordinator, landscape designer and architect lot E2-C
BARRAULT PRESSACCO, architect lot E5
DREAM, architect lot E3 - offices
LAMBERT LÉNACK, architect lot E1-A-bâtiment proue
SOA, architect lot E1-B and coordinators

CoBe missions
Urban planning coordinator

Program
525 homes (37,888m² net floor area)
Offices (13,054 m² net floor area)
Shops and services
(4,826 m² including crèche, catering, craft industry, Fab lab, basketball court)

Area
55 768 m²

Cost
169M EXCL. TAX

Delivered 2024