{"id":10921,"date":"2023-06-16T14:28:07","date_gmt":"2023-06-16T12:28:07","guid":{"rendered":"https:\/\/cobe.fr\/?p=10921"},"modified":"2023-06-19T12:03:47","modified_gmt":"2023-06-19T10:03:47","slug":"start-of-construction-work-in-bordeaux","status":"publish","type":"post","link":"https:\/\/cobe.fr\/en\/debut-de-chantier-a-bordeaux\/","title":{"rendered":"Start of construction work in Bordeaux"},"content":{"rendered":"<p class=\"has-text-align-center wp-block-paragraph\">\ud83c\udfd7 \ud83c\udf33 The Armagnac Sud project in Bordeaux is off to a flying start, with CoBe Bordeaux's main contractors keeping a very close eye on the progress! <\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Located on plot 8.16, in the Armagnac Sud sector of the Saint-Jean Belcier mixed development zone, close to the station, this housing project is structured around a base ranging from ground floor to 3 storeys above ground level, with patios connected to the surrounding public space, and topped by four distinct 'emergences'. The two 10-storey towers are composed of a mixed wood-concrete structure, an external metal mesh and timber-framed facades. <\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">A lower elevation is built entirely from timber frames. This building complex houses 94 through-planning, multi-orientated homes, each of which benefits from at least two orientations, unoverlooked living rooms and generous outdoor spaces offering multiple views towards the landscape and the garden at the heart of the block. <\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">The entire project has NF Habitat HQE 9* certification, is approaching level 3 of the Biosourced label, and is in the process of obtaining E+C- certification.<\/p>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"837\" src=\"https:\/\/cobe.fr\/wp-content\/uploads\/2023\/05\/PREVIEW-C07-1024x837.jpg\" alt=\"Cobe Armagnac Sud in Bordeaux, \" class=\"wp-image-10923\" srcset=\"https:\/\/cobe.fr\/wp-content\/uploads\/2023\/05\/PREVIEW-C07-1024x837.jpg 1024w, https:\/\/cobe.fr\/wp-content\/uploads\/2023\/05\/PREVIEW-C07-300x245.jpg 300w, https:\/\/cobe.fr\/wp-content\/uploads\/2023\/05\/PREVIEW-C07-768x628.jpg 768w, https:\/\/cobe.fr\/wp-content\/uploads\/2023\/05\/PREVIEW-C07-15x12.jpg 15w, https:\/\/cobe.fr\/wp-content\/uploads\/2023\/05\/PREVIEW-C07-500x409.jpg 500w, https:\/\/cobe.fr\/wp-content\/uploads\/2023\/05\/PREVIEW-C07-800x654.jpg 800w, https:\/\/cobe.fr\/wp-content\/uploads\/2023\/05\/PREVIEW-C07.jpg 1100w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-fe0a7de2 wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/cobe.fr\/en\/portfolio-item\/housing-in-the-woods-bordeaux-33\/\">See the project<\/a><\/div>\n<\/div>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>","protected":false},"excerpt":{"rendered":"<p>\ud83c\udfd7 \ud83c\udf33 Top d\u00e9part pour le chantier de l\u2019op\u00e9ration Armagnac Sud \u00e0 Bordeaux, suivie de tr\u00e8s pr\u00e8s par les ma\u00eetres d\u2019\u0153uvre d\u2019ex\u00e9cution de CoBe Bordeaux&nbsp;! Situ\u00e9 sur l&rsquo;ilot 8.16, secteur Armagnac Sud, ZAC Saint-Jean Belcier \u00e0 proximit\u00e9 de la gare, ce projet de logements se structure autour d\u2019un socle variant de RDC \u00e0 R+3, creus\u00e9 [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":10929,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"D\u00e9but de chantier \u00e0 Bordeaux ","_seopress_titles_desc":"Top d\u00e9part pour le chantier de l\u2019op\u00e9ration Armagnac Sud \u00e0 Bordeaux, suivie de tr\u00e8s pr\u00e8s par les ma\u00eetres d\u2019\u0153uvre d\u2019ex\u00e9cution de CoBe Bordeaux\u00a0! ","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"none","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"both","_seopress_redirections_param":"","_seopress_redirections_type":301,"_seopress_analysis_target_kw":"CoBe,Armagnac Sud,chantier","_vp_format_video_url":"","_vp_image_focal_point":[],"footnotes":""},"categories":[4],"tags":[],"class_list":["post-10921","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":6}},"featured_image_src":"https:\/\/cobe.fr\/wp-content\/uploads\/2023\/06\/PREVIEW-C07600x400.jpg","featured_image_src_square":"https:\/\/cobe.fr\/wp-content\/uploads\/2023\/06\/PREVIEW-C07600x400.jpg","author_info":{"display_name":"Victorien Diaz","author_link":"https:\/\/cobe.fr\/en\/author\/victorien\/"},"rbea_author_info":{"display_name":"Victorien Diaz","author_link":"https:\/\/cobe.fr\/en\/author\/victorien\/"},"rbea_excerpt_info":"\ud83c\udfd7 \ud83c\udf33 Top d\u00e9part pour le chantier de l\u2019op\u00e9ration Armagnac Sud \u00e0 Bordeaux, suivie de tr\u00e8s pr\u00e8s par les ma\u00eetres d\u2019\u0153uvre d\u2019ex\u00e9cution de CoBe Bordeaux&nbsp;! Situ\u00e9 sur l&rsquo;ilot 8.16, secteur Armagnac Sud, ZAC Saint-Jean Belcier \u00e0 proximit\u00e9 de la gare, ce projet de logements se structure autour d\u2019un socle variant de RDC \u00e0 R+3, creus\u00e9 [&hellip;]","category_list":"<a href=\"https:\/\/cobe.fr\/en\/news\/\" rel=\"category tag\">News<\/a>","comments_num":"0 comments","_links":{"self":[{"href":"https:\/\/cobe.fr\/en\/wp-json\/wp\/v2\/posts\/10921","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cobe.fr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cobe.fr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cobe.fr\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/cobe.fr\/en\/wp-json\/wp\/v2\/comments?post=10921"}],"version-history":[{"count":0,"href":"https:\/\/cobe.fr\/en\/wp-json\/wp\/v2\/posts\/10921\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cobe.fr\/en\/wp-json\/wp\/v2\/media\/10929"}],"wp:attachment":[{"href":"https:\/\/cobe.fr\/en\/wp-json\/wp\/v2\/media?parent=10921"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cobe.fr\/en\/wp-json\/wp\/v2\/categories?post=10921"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cobe.fr\/en\/wp-json\/wp\/v2\/tags?post=10921"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}